Loading
Page views this IP this session = 1 of 10 unsubscribed pagesLoftsome Bridge Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Loftsome Bridge Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Loftsome Bridge Wind Farm (Wind , Active) Location in the UK : England, Loftsome Bridge Water treatment Works Type of installation: Wind on/offshore: on Turbines :2 Capacity : 2.6 MW Approx Date of 1st power generation: February 2008
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
We were given permission to install two 90m wind turbines to provide an average of a third of our energy needs for the site. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Loftsome Bridge Water treatment Works - A, D (24/0 Hull road Loftsome Bridge Newsholme Selby YO8 6EN
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Loftsome Bridge 1.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: Selby District Council
|
Site ID and Reference: |
2943 / EN00166
District:
|
Applicant: |
Yorkshire Water
Application :
06/05245/STPLF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Loftsome Bridge Water Treatment Works, Water Treatment Works Acc Rd, Barmby On The Marsh, East Riding Of Yorkshire, DN14 6ET
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
470140 / 470140
|
Development Status: |
Operational
|
Application Submitted: |
6/28/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/2008
|
This Record Last Updated: |
8/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 5.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/6/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|